KPMG Plaza Floors 8-15

Location of Project

Dallas, TX

Project Contractor:

Direct Sale to Developer

Project Budget:

$100-$250K

Installation of 994 manual MechoSystems roller shades at all exterior windows. SOL Shading Solutions worked extensively with the developer and contractor to coordinate the installation within a narrow 2 week window, often having to work directly with the furniture build-out on several floors.

Installation of 994 manual MechoSystems roller shades at all exterior windows. SOL Shading Solutions worked extensively with the developer and contractor to coordinate the installation within a narrow 2 week window, often having to work directly with the furniture build-out on several floors.

Category: