Hanover Crescent Falls Church

Location of Project

Falls Church, VA

Project Contractor:

The Hanover Company

Project Budget:

$250-$500K

Manual Mechosystems roller shades installed in a 5 story, podium style residential building. All storefront window shades in the residential units required installation to concrete.

Manual Mechosystems roller shades installed in a 5 story, podium style residential building. All storefront window shades in the residential units required installation to concrete.

Category: