Hanover 1900 McKinney
Location of Project
Dallas, TX
Project Contractor:
The Hanover Company
Project Budget:
$250-$500K
Installation of Mechosystems manual roller shades installed in the residences of a 27 story high rise. The penthouse units required shades mounted to concrete due to the design of exposed concrete as the finished ceiling. Monumental motorized roller shades were installed in the lobby and the clubhouse.