Citigroup

Location of Project

Irving, TX

Project Contractor:

Owner Direct

Project Budget:

$100-$250K

Change out of aluminum mini-blinds to manual Ecoveil roller shades at the main building in Las Colinas. Ecoveil shades were also installed at the satellite building. Overall scope exceeded 1,000 manual shades. The pre-existing mini-blinds were recycled by the owner to make this a sustainable project.

Change out of aluminum mini-blinds to manual Ecoveil roller shades at the main building in Las Colinas. Ecoveil shades were also installed at the satellite building. Overall scope exceeded 1,000 manual shades. The pre-existing mini-blinds were recycled by the owner to make this a sustainable project.

Category: