Bank of America

Location of Project

Dallas, TX

Project Contractor:

The Whiting-Turner Contracting Company

Project Budget:

$100-$250K

1,152 MechoSystems manual roller shades utilizing the Mecho5 bracket system and 12 motorized shades installed with IQ/MLC’s linked into the AV system for independent control. This was installed on a muti-phase turnover of 18 floors covering a span of 10 months.

1,152 MechoSystems manual roller shades utilizing the Mecho5 bracket system and 12 motorized shades installed with IQ/MLC’s linked into the AV system for independent control. This was installed on a muti-phase turnover of 18 floors covering a span of 10 months.