Bank of America
Location of Project
Dallas, TX
Project Contractor:
The Whiting-Turner Contracting Company
Project Budget:
$100-$250K
1,152 MechoSystems manual roller shades utilizing the Mecho5 bracket system and 12 motorized shades installed with IQ/MLC’s linked into the AV system for independent control. This was installed on a muti-phase turnover of 18 floors covering a span of 10 months.